Saamarth City
F.P. NO - 17, TP-9, SURVEY NO -53, SAAMARTH CITY, VASNA-HADMATIYA ROAD, SARGASAN,
Filing PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA07707/261120
Paperwork score
Some gaps
A mechanical read of this promoter’s public filing record. Delivery standing carries the most weight and falls in steps the further the declared completion date has slipped; then quarterly filings, then the promoter’s own completed projects, then a check for complaints and extension requests on the ledger. It measures the filing record only — not construction quality, resale value, or whether you should buy — and it is not a LetsInvest rating of the project.
Bands: Complete record at 80%+ of the points available, Some gaps at 60–79%, Material gaps below 60%. The cut-offs come from how all 1,664 filings in this snapshot actually spread, not from a fixed grade — roughly a third reach “Complete record”, so it describes this filing rather than praising it.
Project at a glance
- Developer
- Sudarshan Buildcon
- Project type
- Residential / Group Housing
- Total units
- 116
- Project cost
- ₹149.65 Cr
- Carpet area
- 28,368.2 sq m
- Price band
- ₹69L – ₹0L
- Carpet area per unit
- 224.99-399.33 sq m
- Status
- Ongoing
Filing extras — blocks, inventory lines, dates
- Residential/Group Housing — 116 units · carpet 28,368.24 sq m
- Block BLOCK B1
- Block BLOCK B2
- Block BLOCK B3
- Block BLOCK B4
- Block BLOCK B5
- Block BLOCK B6
- Block BLOCK B7
- Block TYPE A1
- Block TYPE A10
- Block TYPE A11
- Block TYPE A12
- Block TYPE A13
- Block TYPE A2
- Block TYPE A3
- Block TYPE A4
- Block TYPE A5
- Block TYPE A6
- Block TYPE A7
- Block TYPE A8
- Block TYPE A9
- Declared start 2020-03-16 · completion 2024-12-31
- Professionals on record: 1 architect(s), 1 engineer(s) · land not itemised
Location
23.1987° N, 72.6181° E
Units & inventory
116
Total units
77
Booked (66%)
39
Unsold (34%)
66% booked · 34% unsold
8 booked (80%) · 2 available (20%)
9 booked (90%) · 1 available (10%)
9 booked (90%) · 1 available (10%)
3 booked (30%) · 7 available (70%)
0 booked (0%) · 10 available (100%)
5 booked (63%) · 3 available (37%)
1 booked (10%) · 9 available (90%)
1 booked (100%) · 0 available (0%)
5 booked (100%) · 0 available (0%)
5 booked (100%) · 0 available (0%)
1 booked (100%) · 0 available (0%)
0 booked (0%) · 4 available (100%)
2 booked (100%) · 0 available (0%)
14 booked (100%) · 0 available (0%)
1 booked (100%) · 0 available (0%)
2 booked (100%) · 0 available (0%)
6 booked (100%) · 0 available (0%)
3 booked (60%) · 2 available (40%)
1 booked (100%) · 0 available (0%)
1 booked (100%) · 0 available (0%)
Flat-level inventory (116 units)
| Flat | Block | Carpet m² | Status |
|---|---|---|---|
| A 1 | TYPE A1 | 275.82 | BOOKED |
| A 2 | TYPE A2 | 263.63 | BOOKED |
| A 3 | TYPE A2 | 263.63 | BOOKED |
| A 4 | TYPE A3 | 244.37 | BOOKED |
| A 5 | TYPE A3 | 244.37 | BOOKED |
| A 6 | TYPE A3 | 244.37 | BOOKED |
| A 7 | TYPE A3 | 244.37 | BOOKED |
| A 8 | TYPE A3 | 244.37 | BOOKED |
| A 9 | TYPE A3 | 244.37 | BOOKED |
| A 10 | TYPE A3 | 244.37 | BOOKED |
| A 11 | TYPE A3 | 244.37 | BOOKED |
| A 12 | TYPE A3 | 244.37 | BOOKED |
| A 13 | TYPE A3 | 244.37 | BOOKED |
| A 14 | TYPE A3 | 244.37 | BOOKED |
| A 15 | TYPE A3 | 244.37 | BOOKED |
| A 16 | TYPE A3 | 244.37 | BOOKED |
| A 17 | TYPE A3 | 244.37 | BOOKED |
| A 18 | TYPE A4 | 248.62 | BOOKED |
| A 19 | TYPE A5 | 376.70000000000005 | BOOKED |
| A 20 | TYPE A5 | 376.70000000000005 | BOOKED |
| A 21 | TYPE A6 | 278.97 | BOOKED |
| A 22 | TYPE A6 | 278.97 | BOOKED |
| A 23 | TYPE A6 | 278.97 | BOOKED |
| A 24 | TYPE A6 | 278.97 | BOOKED |
| A 25 | TYPE A6 | 278.97 | BOOKED |
| A 26 | TYPE A6 | 278.97 | BOOKED |
| A 27 | TYPE A7 | 268.73 | BOOKED |
| A 28 | TYPE A7 | 268.73 | UNBOOKED |
| A 29 | TYPE A7 | 268.73 | BOOKED |
| A 30 | TYPE A7 | 268.73 | UNBOOKED |
| A 31 | TYPE A7 | 268.73 | BOOKED |
| A 32 | TYPE A8 | 265.46000000000004 | BOOKED |
| A 33 | TYPE A9 | 333.36 | BOOKED |
| A 34 | TYPE A10 | 226.23000000000002 | BOOKED |
| A 35 | TYPE A10 | 226.23000000000002 | BOOKED |
| A 36 | TYPE A10 | 226.23000000000002 | BOOKED |
| A 37 | TYPE A10 | 226.23000000000002 | BOOKED |
| A 38 | TYPE A10 | 226.23000000000002 | BOOKED |
| A 39 | TYPE A11 | 230.35000000000002 | BOOKED |
| A 40 | TYPE A11 | 230.35000000000002 | BOOKED |
| A 41 | TYPE A11 | 230.35000000000002 | BOOKED |
| A 42 | TYPE A11 | 230.35000000000002 | BOOKED |
| A 43 | TYPE A11 | 230.35000000000002 | BOOKED |
| A 44 | TYPE A12 | 224.99 | BOOKED |
| A 45 | TYPE A13 | 291.15999999999997 | UNBOOKED |
| A 46 | TYPE A13 | 291.15999999999997 | UNBOOKED |
| A 47 | TYPE A13 | 291.15999999999997 | UNBOOKED |
| A 48 | TYPE A13 | 291.15999999999997 | UNBOOKED |
| B 1 | BLOCK B1 | 228.04 | BOOKED |
| B 2 | BLOCK B1 | 225.97000000000003 | BOOKED |
| B 3 | BLOCK B1 | 225.97000000000003 | BOOKED |
| B 4 | BLOCK B1 | 225.97000000000003 | BOOKED |
| B 5 | BLOCK B1 | 225.97000000000003 | BOOKED |
| B 6 | BLOCK B1 | 225.97000000000003 | UNBOOKED |
| B 7 | BLOCK B1 | 225.97000000000003 | BOOKED |
| B 8 | BLOCK B1 | 225.97000000000003 | UNBOOKED |
| B 9 | BLOCK B1 | 225.97000000000003 | BOOKED |
| B 10 | BLOCK B1 | 228.04 | BOOKED |
| B 11 | BLOCK B2 | 228.04 | BOOKED |
| B 12 | BLOCK B2 | 225.97000000000003 | UNBOOKED |
| B 13 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 14 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 15 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 16 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 17 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 18 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 19 | BLOCK B2 | 225.97000000000003 | BOOKED |
| B 20 | BLOCK B2 | 228.04 | BOOKED |
| B 21 | BLOCK B3 | 228.04 | UNBOOKED |
| B 22 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 23 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 24 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 25 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 26 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 27 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 28 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 29 | BLOCK B3 | 225.97000000000003 | BOOKED |
| B 30 | BLOCK B3 | 228.04 | BOOKED |
| B 31 | BLOCK B4 | 228.04 | BOOKED |
| B 32 | BLOCK B4 | 225.97000000000003 | BOOKED |
| B 33 | BLOCK B4 | 225.97000000000003 | BOOKED |
| B 34 | BLOCK B4 | 225.97000000000003 | UNBOOKED |
| B 35 | BLOCK B4 | 225.97000000000003 | UNBOOKED |
| B 36 | BLOCK B4 | 225.97000000000003 | UNBOOKED |
| B 37 | BLOCK B4 | 225.97000000000003 | UNBOOKED |
| B 38 | BLOCK B4 | 225.97000000000003 | UNBOOKED |
| B 39 | BLOCK B4 | 225.97000000000003 | UNBOOKED |
| B 40 | BLOCK B4 | 228.04 | UNBOOKED |
| B 41 | BLOCK B5 | 228.04 | UNBOOKED |
| B 42 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 43 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 44 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 45 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 46 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 47 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 48 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 49 | BLOCK B5 | 225.97000000000003 | UNBOOKED |
| B 50 | BLOCK B5 | 228.04 | UNBOOKED |
| B 51 | BLOCK B6 | 228.04 | BOOKED |
| B 52 | BLOCK B6 | 225.97000000000003 | BOOKED |
| B 53 | BLOCK B6 | 225.97000000000003 | BOOKED |
| B 54 | BLOCK B6 | 225.97000000000003 | BOOKED |
| B 55 | BLOCK B6 | 225.97000000000003 | UNBOOKED |
| B 56 | BLOCK B6 | 225.97000000000003 | UNBOOKED |
| B 57 | BLOCK B6 | 225.97000000000003 | UNBOOKED |
| B58 & B59 | BLOCK B6 | 399.33 | BOOKED |
| B 60 | BLOCK B7 | 255.55 | BOOKED |
| B 61 | BLOCK B7 | 245.6 | UNBOOKED |
| B 62 | BLOCK B7 | 245.6 | UNBOOKED |
| B 63 | BLOCK B7 | 245.6 | UNBOOKED |
| B 64 | BLOCK B7 | 245.6 | UNBOOKED |
| B 65 | BLOCK B7 | 245.6 | UNBOOKED |
| B 66 | BLOCK B7 | 245.6 | UNBOOKED |
| B 67 | BLOCK B7 | 245.6 | UNBOOKED |
| B 68 | BLOCK B7 | 245.6 | UNBOOKED |
| B 69 | BLOCK B7 | 330.40000000000003 | UNBOOKED |
Booking status as filed — confirm availability with the builder.
Construction progress
Reported completion: 84.06%10 quarterly returns · April 2021 (20.68%) to January 2025 (84.06%)
20.68%
Initial progress · April 2021
84.06%
Final progress · January 2025
Builder-declared quarterly returns — not an independent inspection.
RERA activity timeline
2020
Registration
2021
Annual Compliance
2022
Annual Compliance
2023
Complaint · Challan · Annual Compliance
2024
Annual Compliance
2025
Annual Compliance
2026
Snapshot reviewed
Full application ledger (8 rows)
- Registration — 2020-11-26 11:37:15.000000
- Complaint — 2023-08-03 12:52:16 · GJ/CMP/SM/Gandhinagar/230620/0151 (CLOSED)
- Challan — 2023-10-11 17:04:12 · GJ/CMP/SM/Gandhinagar/230620/0151 (status not published)
- Annual Compliance — 2021-12-30 15:09:06
- Annual Compliance — 2022-11-03 10:03:34
- Annual Compliance — 2023-10-31 21:18:37
- Annual Compliance — 2024-09-30 14:59:53
- Annual Compliance — 2025-12-10 17:57:03
Quarterly filing history
2021
Q-1 · Q-2 · Q-3 · Q-4
2022
Q-5 · Q-6 · Q-7
2023
Q-8 · Q-9 · Q-E
—
Q-10 · Q-11 · Q-12 · Q-13 · Q-14 · Q-15
10 submitted · 6 missing
Documents on file
42 documentsMissing from this record: Registration certificate.
Registration (0)Registration certificate
- None on this record.
Land & title (4)Title · EC · Clearance
4 of 4 open directly
Approvals (6)Plans · CC · NOCs
- Commencement certificate
- Sanctioned plan
- Approved layout plan
- Approved building plan
- Area development plan
- NOCs from authorities
6 of 6 open directly
Builder finances (22)Accounts · ITR · Audit reports
- Auditor's report (1 of 3)
- Auditor's report (2 of 3)
- Auditor's report (3 of 3)
- Director's report (1 of 3)
- Director's report (2 of 3)
- Director's report (3 of 3)
- Income-tax return (1 of 3)
- Income-tax return (2 of 3)
- Income-tax return (3 of 3)
- PAN card
- auditedBalSheetDoc1
- auditedBalSheetDoc2_
- auditedBalSheetDoc3
- auditedProfitLossSheetDoc1
- auditedProfitLossSheetDoc2
- auditedProfitLossSheetDoc3
- auditedReportDoc1
- auditedReportDoc2
- auditedReportDoc3
- cashFlowStmtFileDoc1
- cashFlowStmtFileDoc2
- cashFlowStmtFileDoc3
22 of 22 open directly
Files open on the GujRERA portal — confirm the latest there. Entries without a link sit behind the portal viewer.
View documents on GujRERASearch PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA07707/261120 → Documents tab
Filing depth
Beyond the headline — land, money trail, inspection phases and the filing PDFs themselves.
Land & money
- Village (moje)
- Sargasan
- TP scheme
- SARGASAN-UVARSAD-VASNA-HADAMATIYA-TARAPUR
- Authority
- Gandhinagar Urban Development Authority
- Covered area
- 13540 sq m
- Open area
- 16760 sq m
- Land cost
- ₹76.5 Cr
- Estimated cost
- ₹55 Cr
- BU permission
- Registration cert
- Portal file
- Ack no.
- PR/GANDHINAGAR/GANDHINAGAR/GANDHINAGAR TPO/201013/009679
- Parking for sale
- 116
Escrow account
- Bank
- Axis Bank
- Branch
- SARGASAN CROSS ROAD
- IFSC
- UTIB0004377
- Account
- XXXX-6097
- Deposited
- ₹8.57 Cr
- Withdrawn
- ₹8.29 Cr
- Closing
- ₹0.28 Cr
- Status
- APPROVED
Inspection phases (Form-1)
- Architect
- NIYATIBAHEN MAHENDRAKUMAR MISTRY
- Firm
- NIRMAN ASSOCIATES
- Site visit
- 2023-06-20
- Form-1 PDF
- Open file
- Block TYPE A181.25%
- Block TYPE A281.25%
- Block TYPE A381.25%
- Block TYPE A481.25%
- Block TYPE A581.25%
- Block TYPE A681.25%
- Block TYPE A781.25%
- Block TYPE A881.25%
- Block TYPE A981.25%
- Block TYPE A1081.25%
- Block TYPE A1181.25%
- Block TYPE A1281.25%
- Block TYPE A1381.25%
- Block BLOCK B181.25%
- Block BLOCK B281.25%
- Block BLOCK B381.25%
- Block BLOCK B481.25%
- Block BLOCK B581.25%
- Block BLOCK B681.25%
- Block BLOCK B781.25%
Phase actual dates (20 blocks)
- Block TYPE A1: excavation → slab
- Block TYPE A2: excavation → slab
- Block TYPE A3: excavation → slab
- Block TYPE A4: excavation → slab
- Block TYPE A5: excavation → slab
- Block TYPE A6: excavation → slab
- Block TYPE A7: excavation → slab
- Block TYPE A8: excavation → slab
- Block TYPE A9: excavation → slab
- Block TYPE A10: excavation → slab
- Block TYPE A11: excavation → slab
- Block TYPE A12: excavation → slab
- Block TYPE A13: excavation → slab
- Block BLOCK B1: excavation → slab
- Block BLOCK B2: excavation → slab
- Block BLOCK B3: excavation → slab
- Block BLOCK B4: excavation → slab
- Block BLOCK B5: excavation → slab
- Block BLOCK B6: excavation → slab
- Block BLOCK B7: excavation → slab
Filing PDFs
- REG_PROCESS · 2020-10-08 — Form-1 · Form-2
- Q-1 · 2021-03-07 — Form-1 · Form-2
- Q-2 · 2021-07-03 — Form-1 · Form-2
- Q-3 · 2021-09-02 — Form-1 · Form-2
- Q-4 · 2021-12-07 — Form-1 · Form-2
- Q-5 · 2022-03-02 — Form-1 · Form-2
- Q-6 · 2022-07-06 — Form-1 · Form-2
- Q-7 · 2022-10-07 — Form-1 · Form-2
- Q-8 · 2023-01-07 — Form-1 · Form-2
- Q-9 · 2023-04-20 — Form-1 · Form-2
- Q-E · 2023-06-28 — Form-1 · Form-2
- Form-5 · 2020-21 · SUBMITTED — Audit file
- Form-5 · 2021-22 · SUBMITTED — Audit file
- Form-5 · 2022-23 · SUBMITTED — Audit file
- Form-5 · 2023-24 · SUBMITTED — Audit file
- Form-5 · 2024-25 · SUBMITTED — Audit file
Project team on record
- UMANG PATEL · engineer
- Nirman Associates · architect
How is the paperwork score calculated?61 / 100
Delivery standing
24 / 40
Filing discipline
16 / 25
Promoter track record
10 / 20
Complaints and extensions
11 / 15
- Delivery 2024-12-31 elapsed 1 yr ago, progress 84.06% -> 24/40
- QPR filings 10/16 -> 16/25
- Promoter completed projects 1 -> 10/20
- Red flags 1 complaint + 0 extensions -> 11/15
Confidence Medium: declared completion date elapsed 1 year ago with work still declared incomplete; QPR filing rate 62.5% is below 90%; 1 complaint entry on the ledger.
Verify this yourself
If any figure here differs from the GujRERA record, the record is right and this page is wrong. GujRERA project pages have no stable public URL — search the filing number on the portal:
PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA07707/261120
Open this project on GujRERARun the manual check →Sources
Reviewed 26 Sept 2026. Portals move — the MoHUA national index is the fallback, and this hub links straight to each state portal.
- MoHUA - Real Estate Regulatory Authorities of States / UTsThe national index of every state/UT RERA portal. Fallback when a state link moves.
- GujRERA - Gujarat Real Estate Regulatory AuthorityGujarat project / agent / complaint search and registrations.