Suryan Monolith
suryan monolith, sargasan cross, sargasan
Filing PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA02569/EX1/270219
Paperwork score
Material gaps
A mechanical read of this promoter’s public filing record. Delivery standing carries the most weight and falls in steps the further the declared completion date has slipped; then quarterly filings, then the promoter’s own completed projects, then a check for complaints and extension requests on the ledger. It measures the filing record only — not construction quality, resale value, or whether you should buy — and it is not a LetsInvest rating of the project.
Bands: Complete record at 80%+ of the points available, Some gaps at 60–79%, Material gaps below 60%. The cut-offs come from how all 1,664 filings in this snapshot actually spread, not from a fixed grade — roughly a third reach “Complete record”, so it describes this filing rather than praising it.
Project at a glance
- Developer
- Sutariya Developers
- Project type
- Commercial
- Total units
- 68
- Project cost
- ₹26.59 Cr
- Carpet area
- 6,273.5 sq m
- Price band
- ₹11L – ₹0L
- Carpet area per unit
- 24.2-149.59 sq m
- Status
- Delivered
Filing extras — blocks, inventory lines, dates
- Commercial — 68 units · carpet 6,273.52 sq m
- Block SHOP GF 1
- Block SHOP GF 2
- Block SHOP GF 3
- Block SHOP GF 4
- Block SHOP GF 5
- Block SHOP GF 6
- Block SHOP GF 7
- Block SHOP GF 8
- Block SHOP GF 9
- Block SHOP GF 10
- Block SHOP GF 11
- Block SHOP GF 12
- Block SHOP GF 12A
- Block SHOP GF 14
- Block SHOP GF 15
- Block SHOP GF 16
- Block SHOP FF 1
- Block SHOP FF 2
- Block SHOP FF 3
- Block SHOP FF 4
- Block SHOP FF 5
- Block SHOP FF 6
- Block SHOP FF 7
- Block SHOP FF 8
- Block SHOP FF 9
- Block SHOP FF 10
- Block SHOP FF 11
- Block SHOP FF 12
- Block SHOP FF 13
- Block SHOP FF 14
- Block SHOP FF 15
- Block SHOP FF 16
- Block OFFICE SF 1
- Block OFFICE SF 2
- Block OFFICE SF 3
- Block OFFICE SF4
- Block OFFICE SF 5
- Block OFFICE SF 6
- Block OFFICE SF 7
- Block OFFICE SF 8
- Block OFFICE SF 9
- Block OFFICE SF 10
- Block OFFICE SF 11
- Block OFFICE SF 12
- Block OFFICE SF 13
- Block OFFICE SF 14
- Block OFFICE SF 15
- Block OFFICE SF 16
- Block OFFICE TF 1
- Block OFFICE TF 2
- Block OFFICE TF 3
- Block OFFICE TF 4
- Block OFFICE TF 5
- Block OFFICE TF 6
- Block OFFICE TF 7
- Block OFFICE TF 8
- Block OFFICE TF 9
- Block OFFICE TF 10
- Block OFFICE TF 11
- Block OFFICE TF 12
- Block OFFICE TF 13
- Block OFFICE TF 14
- Block OFFICE TF 15
- Block OFFICE TF 16
- Block OFFICE FF 1
- Block OFFICE FF 2
- Block OFFICE FF 3
- Block OFFICE FF 4
- Declared start 2011-08-08 · completion 2019-03-31
- Professionals on record: 1 architect(s), 1 engineer(s) · land not itemised
Location
23.1903° N, 72.6123° E
Units & inventory
68
Total units
4
Booked (6%)
64
Unsold (94%)
6% booked · 94% unsold
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
1 booked (100%) · 0 available (0%)
1 booked (100%) · 0 available (0%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
1 booked (100%) · 0 available (0%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
1 booked (100%) · 0 available (0%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
0 booked (0%) · 1 available (100%)
Flat-level inventory (68 units)
| Flat | Block | Carpet m² | Status |
|---|---|---|---|
| SHOP GF 1 | SHOP GF 1 | 96.05 | UNBOOKED |
| SHOP GF 2 | SHOP GF 2 | 114.53 | UNBOOKED |
| SHOP GF 3 | SHOP GF 3 | 122.32 | UNBOOKED |
| SHOP GF 4 | SHOP GF 4 | 122.28 | UNBOOKED |
| SHOP GF 5 | SHOP GF 5 | 125.24 | UNBOOKED |
| SHOP GF 6 | SHOP GF 6 | 121.65 | UNBOOKED |
| SHOP GF 7 | SHOP GF 7 | 136.34 | BOOKED |
| SHOP GF 8 | SHOP GF 8 | 135.32 | BOOKED |
| SHOP GF 9 | SHOP GF 9 | 131.62 | UNBOOKED |
| SHOP GF 10 | SHOP GF 10 | 96.65 | UNBOOKED |
| SHOP GF11 | SHOP GF 11 | 69.37 | BOOKED |
| SHOP GF-12 | SHOP GF 12 | 24.27 | UNBOOKED |
| SHOP GF 12A | SHOP GF 12A | 55.62 | UNBOOKED |
| SHOP GF 14 | SHOP GF 14 | 41.36 | UNBOOKED |
| SHOP GF 15 | SHOP GF 15 | 46.63 | UNBOOKED |
| SHOP GF 16 | SHOP GF 16 | 44.18 | UNBOOKED |
| SHOP FF 1 | SHOP FF 1 | 101.39 | UNBOOKED |
| SHOP FF 2 | SHOP FF 2 | 107.79 | UNBOOKED |
| SHOP FF 3 | SHOP FF 3 | 122.24 | UNBOOKED |
| SHOP FF 4 | SHOP FF 4 | 122.2 | UNBOOKED |
| SHOP FF 5 | SHOP FF 5 | 126.17 | UNBOOKED |
| SHOP FF 6 | SHOP FF 6 | 122.11 | UNBOOKED |
| SHOP FF 7 | SHOP FF 7 | 135.48 | UNBOOKED |
| SHOP FF 8 | SHOP FF 8 | 135.33 | UNBOOKED |
| SHOP FF 9 | SHOP FF 9 | 118.76 | UNBOOKED |
| SHOP FF 10 | SHOP FF 10 | 77.42 | UNBOOKED |
| SHOP FF 11 | SHOP FF 11 | 70.52 | UNBOOKED |
| SHOP FF 12 | SHOP FF 12 | 24.2 | UNBOOKED |
| SHOP FF 13 | SHOP FF 13 | 55.47 | UNBOOKED |
| SHOP FF 14 | SHOP FF 14 | 41.28 | UNBOOKED |
| SHOP FF 15 | SHOP FF 15 | 46.55 | UNBOOKED |
| SHOP FF 16 | SHOP FF 16 | 44.11 | UNBOOKED |
| OFFICE SF 1 | OFFICE SF 1 | 94.83 | UNBOOKED |
| OFFICE SF 2 | OFFICE SF 2 | 94.96 | UNBOOKED |
| OFFICE SF 3 | OFFICE SF 3 | 101.14 | UNBOOKED |
| OFFICE SF 4 | OFFICE SF4 | 101.13 | UNBOOKED |
| OFFICE SF 5 | OFFICE SF 5 | 103.38 | UNBOOKED |
| OFFICE SF 6 | OFFICE SF 6 | 104.22 | UNBOOKED |
| OFFICE SF 7 | OFFICE SF 7 | 115.7 | UNBOOKED |
| OFFICE SF 8 | OFFICE SF 8 | 115.51 | UNBOOKED |
| OFFICE SF 9 | OFFICE SF 9 | 111.85 | UNBOOKED |
| OFFICE SF 10 | OFFICE SF 10 | 79.78 | UNBOOKED |
| OFFICE SF 11 | OFFICE SF 11 | 67.64 | UNBOOKED |
| OFFICE SF 12 | OFFICE SF 12 | 60.26 | UNBOOKED |
| OFFICE SF 13 | OFFICE SF 13 | 69.19 | UNBOOKED |
| OFFICE SF 14 | OFFICE SF 14 | 62.2 | UNBOOKED |
| OFFICE SF 15 | OFFICE SF 15 | 67.16 | UNBOOKED |
| OFFICE SF 16 | OFFICE SF 16 | 79.64 | UNBOOKED |
| OFFICE TF 1 | OFFICE TF 1 | 94.83 | UNBOOKED |
| OFFICE TF 2 | OFFICE TF 2 | 94.96 | UNBOOKED |
| OFFICE TF 3 | OFFICE TF 3 | 101.14 | UNBOOKED |
| OFFICE TF 4 | OFFICE TF 4 | 101.13 | UNBOOKED |
| OFFICE TF 5 | OFFICE TF 5 | 103.38 | UNBOOKED |
| OFFICE TF 6 | OFFICE TF 6 | 104.22 | UNBOOKED |
| OFFICE TF 7 | OFFICE TF 7 | 115.7 | UNBOOKED |
| OFFICE TF 8 | OFFICE TF 8 | 115.51 | UNBOOKED |
| OFFICE TF 9 | OFFICE TF 9 | 111.85 | UNBOOKED |
| OFFICE TF 10 | OFFICE TF 10 | 79.78 | UNBOOKED |
| OFFICE TF 11 | OFFICE TF 11 | 67.64 | UNBOOKED |
| OFFICE TF 12 | OFFICE TF 12 | 60.26 | UNBOOKED |
| OFFICE TF 13 | OFFICE TF 13 | 69.19 | UNBOOKED |
| OFFICE TF 14 | OFFICE TF 14 | 62.2 | UNBOOKED |
| OFFICE TF 15 | OFFICE TF 15 | 67.16 | UNBOOKED |
| OFFICE TF 16 | OFFICE TF 16 | 79.64 | UNBOOKED |
| OFFICE FF 1 | OFFICE FF 1 | 123.41 | BOOKED |
| OFFICE FF 2 | OFFICE FF 2 | 104.97 | UNBOOKED |
| OFFICE FF 3 | OFFICE FF 3 | 103.92 | UNBOOKED |
| OFFICE FF 4 | OFFICE FF 4 | 149.59 | UNBOOKED |
Booking status as filed — confirm availability with the builder.
Construction progress
Reported completion: 100%1 quarterly returns · April 2019 (100%) to April 2019 (100%)
100%
Initial progress · April 2019
100%
Final progress · April 2019
Builder-declared quarterly returns — not an independent inspection.
RERA activity timeline
2018
Registration
2019
Extension · Complaint
2020
Challan
2022
Complaint
2026
Snapshot reviewed
Full application ledger (5 rows)
- Registration — 2018-05-07 12:57:15.000000
- Extension — 2019-02-27 12:11:21
- Complaint — 2019-10-24 17:54:06 · GJ/CMP/NCQR/Gandhinagar/190918/0434 (CLOSED)
- Complaint — 2022-05-12 06:51:15 · GJ/CMP/NCQR/Ahmedabad/211229/0114 (CLOSED)
- Challan — 2020-02-29 16:13:36 · GJ/CMP/NCQR/Gandhinagar/190918/0434 (status not published)
Quarterly filing history
—
Q-1 · Q-2 · X-1
2021
Q-E
1 submitted · 3 missing
Documents on file
39 documentsMissing from this record: Registration certificate, Title clearance certificate, Title report.
Registration (0)Registration certificate
- None on this record.
Land & title (2)Title · EC · Clearance
2 of 2 open directly
Approvals (6)Plans · CC · NOCs
- Commencement certificate
- Sanctioned plan
- Approved layout plan
- Approved building plan
- Area development plan
- NOCs from authorities
6 of 6 open directly
Builder finances (22)Accounts · ITR · Audit reports
- Auditor's report (1 of 3)
- Auditor's report (2 of 3)
- Auditor's report (3 of 3)
- Director's report (1 of 3)
- Director's report (2 of 3)
- Director's report (3 of 3)
- Income-tax return (1 of 3)
- Income-tax return (2 of 3)
- Income-tax return (3 of 3)
- PAN card
- auditedBalSheetDoc1
- auditedBalSheetDoc2_
- auditedBalSheetDoc3
- auditedProfitLossSheetDoc1
- auditedProfitLossSheetDoc2
- auditedProfitLossSheetDoc3
- auditedReportDoc1
- auditedReportDoc2
- auditedReportDoc3
- cashFlowStmtFileDoc1
- cashFlowStmtFileDoc2
- cashFlowStmtFileDoc3
22 of 22 open directly
Files open on the GujRERA portal — confirm the latest there. Entries without a link sit behind the portal viewer.
View documents on GujRERASearch PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA02569/EX1/270219 → Documents tab
Filing depth
Beyond the headline — land, money trail, inspection phases and the filing PDFs themselves.
Land & money
- Village (moje)
- Sargasan
- TP scheme
- Sargasan - Kudasan - Por
- Authority
- Gandhinagar Urban Development Authority
- Covered area
- 1790.34 sq m
- Open area
- 2680.66 sq m
- Land cost
- ₹1.11 Cr
- Estimated cost
- ₹25.48 Cr
- BU permission
- Registration cert
- Portal file
- Ack no.
- PR/GANDHINAGAR/GANDHINAGAR/GANDHINAGAR TPO/171031/003892
- Covered parking
- 83 · 1024 sq m
- Parking for sale
- 24
Escrow account
- Bank
- ICICI Bank
- Branch
- SOUTH BOPAL BRANCH
- IFSC
- ICIC0003465
- Account
- XXXX-0438
- Closing
- ₹0.01 Cr
- Status
- APPROVED
Inspection phases (Form-1)
- Architect
- MR RAMESH PATEL
- Site visit
- 2020-10-09
- Form-1 PDF
- Open file
- Block SHOP GF 1100%
- Block SHOP GF 2100%
- Block SHOP GF 3100%
- Block SHOP GF 4100%
- Block SHOP GF 5100%
- Block SHOP GF 6100%
- Block SHOP GF 7100%
- Block SHOP GF 8100%
- Block SHOP GF 9100%
- Block SHOP GF 10100%
- Block SHOP GF 11100%
- Block SHOP GF 12100%
- Block SHOP GF 12A100%
- Block SHOP GF 14100%
- Block SHOP GF 15100%
- Block SHOP GF 16100%
- Block SHOP FF 1100%
- Block SHOP FF 2100%
- Block SHOP FF 3100%
- Block SHOP FF 4100%
- Block SHOP FF 5100%
- Block SHOP FF 6100%
- Block SHOP FF 7100%
- Block SHOP FF 8100%
- Block SHOP FF 9100%
- Block SHOP FF 10100%
- Block SHOP FF 11100%
- Block SHOP FF 12100%
- Block SHOP FF 13100%
- Block SHOP FF 14100%
- Block SHOP FF 15100%
- Block SHOP FF 16100%
- Block OFFICE SF 1100%
- Block OFFICE SF 2100%
- Block OFFICE SF 3100%
- Block OFFICE SF4100%
- Block OFFICE SF 5100%
- Block OFFICE SF 6100%
- Block OFFICE SF 7100%
- Block OFFICE SF 8100%
- Block OFFICE SF 9100%
- Block OFFICE SF 10100%
- Block OFFICE SF 11100%
- Block OFFICE SF 12100%
- Block OFFICE SF 13100%
- Block OFFICE SF 14100%
- Block OFFICE SF 15100%
- Block OFFICE SF 16100%
- Block OFFICE TF 1100%
- Block OFFICE TF 2100%
- Block OFFICE TF 3100%
- Block OFFICE TF 4100%
- Block OFFICE TF 5100%
- Block OFFICE TF 6100%
- Block OFFICE TF 7100%
- Block OFFICE TF 8100%
- Block OFFICE TF 9100%
- Block OFFICE TF 10100%
- Block OFFICE TF 11100%
- Block OFFICE TF 12100%
- Block OFFICE TF 13100%
- Block OFFICE TF 14100%
- Block OFFICE TF 15100%
- Block OFFICE TF 16100%
- Block OFFICE FF 1100%
- Block OFFICE FF 2100%
- Block OFFICE FF 3100%
- Block OFFICE FF 4100%
Phase actual dates (68 blocks)
- Block SHOP FF 11: excavation — → slab —
- Block SHOP FF 12: excavation — → slab —
- Block SHOP FF 13: excavation — → slab —
- Block SHOP FF 14: excavation — → slab —
- Block SHOP FF 15: excavation — → slab —
- Block SHOP FF 16: excavation — → slab —
- Block OFFICE SF 1: excavation — → slab —
- Block OFFICE SF 2: excavation — → slab —
- Block OFFICE SF 3: excavation — → slab —
- Block OFFICE SF4: excavation — → slab —
- Block OFFICE SF 5: excavation — → slab —
- Block OFFICE SF 6: excavation — → slab —
- Block OFFICE SF 7: excavation — → slab —
- Block OFFICE SF 8: excavation — → slab —
- Block OFFICE SF 9: excavation — → slab —
- Block OFFICE SF 10: excavation — → slab —
- Block OFFICE SF 11: excavation — → slab —
- Block OFFICE SF 12: excavation — → slab —
- Block OFFICE SF 13: excavation — → slab —
- Block OFFICE SF 14: excavation — → slab —
- Block OFFICE SF 15: excavation — → slab —
- Block OFFICE SF 16: excavation — → slab —
- Block OFFICE TF 1: excavation — → slab —
- Block OFFICE TF 2: excavation — → slab —
- Block OFFICE TF 3: excavation — → slab —
- Block OFFICE TF 4: excavation — → slab —
- Block OFFICE TF 5: excavation — → slab —
- Block OFFICE TF 6: excavation — → slab —
- Block OFFICE TF 7: excavation — → slab —
- Block OFFICE TF 8: excavation — → slab —
- Block OFFICE TF 9: excavation — → slab —
- Block OFFICE TF 10: excavation — → slab —
- Block OFFICE TF 11: excavation — → slab —
- Block OFFICE TF 12: excavation — → slab —
- Block OFFICE TF 13: excavation — → slab —
- Block OFFICE TF 14: excavation — → slab —
- Block OFFICE TF 15: excavation — → slab —
- Block OFFICE TF 16: excavation — → slab —
- Block OFFICE FF 1: excavation — → slab —
- Block OFFICE FF 2: excavation — → slab —
- Block OFFICE FF 3: excavation — → slab —
- Block OFFICE FF 4: excavation — → slab —
- Block SHOP GF 1: excavation — → slab —
- Block SHOP GF 2: excavation — → slab —
- Block SHOP GF 3: excavation — → slab —
- Block SHOP GF 4: excavation — → slab —
- Block SHOP GF 5: excavation — → slab —
- Block SHOP GF 6: excavation — → slab —
- Block SHOP GF 7: excavation — → slab —
- Block SHOP GF 8: excavation — → slab —
- Block SHOP GF 9: excavation — → slab —
- Block SHOP GF 10: excavation — → slab —
- Block SHOP GF 11: excavation — → slab —
- Block SHOP GF 12: excavation — → slab —
- Block SHOP GF 12A: excavation — → slab —
- Block SHOP GF 14: excavation — → slab —
- Block SHOP GF 15: excavation — → slab —
- Block SHOP GF 16: excavation — → slab —
- Block SHOP FF 1: excavation — → slab —
- Block SHOP FF 2: excavation — → slab —
- Block SHOP FF 3: excavation — → slab —
- Block SHOP FF 4: excavation — → slab —
- Block SHOP FF 5: excavation — → slab —
- Block SHOP FF 6: excavation — → slab —
- Block SHOP FF 7: excavation — → slab —
- Block SHOP FF 8: excavation — → slab —
- Block SHOP FF 9: excavation — → slab —
- Block SHOP FF 10: excavation — → slab —
Filing PDFs
- REG_PROCESS · 2017-10-31 — ·
- EXT_PROCESS · 2019-01-08 — Form-1 · Form-2
- Q-E · 2021-12-31 — Form-1 · Form-2
- Form-5 · 2018-19 · EXEMPT —
Project team on record
- A.Y.CHIPPA · engineer
- MATHAROO ASSOCIATES · architect
How is the paperwork score calculated?50 / 100
Delivery standing
40 / 40
Filing discipline
6 / 25
Promoter track record
0 / 20
Complaints and extensions
4 / 15
- Delivery 2019-03-31 elapsed, builder-declared 100% (delivered) -> 40/40
- QPR filings 1/4 -> 6/25
- Promoter completed projects 0 -> 0/20
- Red flags 2 complaints + 1 extension -> 4/15
Confidence Medium: QPR filing rate 25.0% is below 90%; no completed project on the promoter record; 2 complaint entries on the ledger; 1 extension request on the ledger.
Verify this yourself
If any figure here differs from the GujRERA record, the record is right and this page is wrong. GujRERA project pages have no stable public URL — search the filing number on the portal:
PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA02569/EX1/270219
Open this project on GujRERARun the manual check →Sources
Reviewed 26 Sept 2026. Portals move — the MoHUA national index is the fallback, and this hub links straight to each state portal.
- MoHUA - Real Estate Regulatory Authorities of States / UTsThe national index of every state/UT RERA portal. Fallback when a state link moves.
- GujRERA - Gujarat Real Estate Regulatory AuthorityGujarat project / agent / complaint search and registrations.