Skip to content
Compare
Last updated: 2026-09-26Source: GujRERAOpen on GujRERA
Delivered

Vrundavan Residency

SURVEY NO 887, PLOT NO. 216

ResidentialGroup Housing123 unitsRERA Reg. No. PR/GJ/GANDHINAGAR/6318

Filing PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05346/EX1/101122

Vrundavan Residency — residential developmentGandhinagar · representative residential imagery

Paperwork score

Some gaps

A mechanical read of this promoter’s public filing record. Delivery standing carries the most weight and falls in steps the further the declared completion date has slipped; then quarterly filings, then the promoter’s own completed projects, then a check for complaints and extension requests on the ledger. It measures the filing record only — not construction quality, resale value, or whether you should buy — and it is not a LetsInvest rating of the project.

Bands: Complete record at 80%+ of the points available, Some gaps at 60–79%, Material gaps below 60%. The cut-offs come from how all 1,664 filings in this snapshot actually spread, not from a fixed grade — roughly a third reach “Complete record”, so it describes this filing rather than praising it.

Project statusDelivered
Quarterly filings12 / 16
Recorded complaints3
Extensions1
Promoter projectsNone completed on record

Project at a glance

Developer
Radhe Developers
Project type
Residential / Group Housing
Total units
123
Project cost
₹27.4 Cr
Carpet area
10,233.2 sq m
Price band
₹21L – ₹0L
Carpet area per unit
59.15-151.94 sq m
Status
Delivered
Filing extras — blocks, inventory lines, dates
  • Residential/Group Housing — 123 units · carpet 10,233.16 sq m
  • Block WING A
  • Block WING B
  • Block WING C
  • Block UNIT 1 TO 9
  • Block UNIT 10 TO 21
  • Block UNIT 22 TO 39
  • Declared start 2019-03-02 · completion 2023-03-31
  • Professionals on record: 1 architect(s), 1 engineer(s) · land not itemised

Location

23.2381° N, 72.6225° E

Filed plot outline · 5 corners
Open in Google Maps

Units & inventory

123

Total units

94

Booked (76%)

29

Unsold (24%)

76% booked · 24% unsold

Tower WING A28 units

19 booked (68%) · 9 available (32%)

Tower WING B28 units

17 booked (61%) · 11 available (39%)

Tower WING C28 units

23 booked (82%) · 5 available (18%)

Tower UNIT 1 TO 99 units

8 booked (89%) · 1 available (11%)

Tower UNIT 10 TO 2112 units

12 booked (100%) · 0 available (0%)

Tower UNIT 22 TO 3918 units

15 booked (83%) · 3 available (17%)

Flat-level inventory (123 units)
Flat inventory: block, carpet area and booking status
FlatBlockCarpet m²Status
A- 101WING A59.15BOOKED
A- 201WING A59.15UNBOOKED
A- 301WING A59.15BOOKED
A- 401WING A59.15UNBOOKED
A- 501WING A59.15BOOKED
A- 601WING A59.15BOOKED
A- 701WING A59.15UNBOOKED
A- 102WING A59.15UNBOOKED
A- 202WING A59.15UNBOOKED
A- 302WING A59.15BOOKED
A- 402WING A59.15BOOKED
A- 502WING A59.15UNBOOKED
A- 602WING A59.15BOOKED
A- 702WING A59.15BOOKED
A- 103WING A59.15BOOKED
A- 203WING A59.15BOOKED
A- 303WING A59.15BOOKED
A- 403WING A59.15BOOKED
A- 503WING A59.15BOOKED
A- 603WING A59.15UNBOOKED
A- 703WING A59.15UNBOOKED
A- 104WING A59.15BOOKED
A- 204WING A59.15UNBOOKED
A- 304WING A59.15BOOKED
A- 404WING A59.15BOOKED
A- 504WING A59.15BOOKED
A- 604WING A59.15BOOKED
A- 704WING A59.15BOOKED
B- 101WING B59.15UNBOOKED
B- 201WING B59.15BOOKED
B- 301WING B59.15BOOKED
B- 401WING B59.15BOOKED
B- 501WING B59.15BOOKED
B- 601WING B59.15BOOKED
B- 701WING B59.15UNBOOKED
B- 102WING B59.15BOOKED
B- 202WING B59.15UNBOOKED
B- 302WING B59.15BOOKED
B- 402WING B59.15UNBOOKED
B- 502WING B59.15BOOKED
B- 602WING B59.15UNBOOKED
B- 702WING B59.15BOOKED
B- 103WING B59.15UNBOOKED
B- 203WING B59.15BOOKED
B- 303WING B59.15BOOKED
B- 403WING B59.15BOOKED
B- 503WING B59.15BOOKED
B- 603WING B59.15BOOKED
B- 703WING B59.15BOOKED
B- 104WING B59.15UNBOOKED
B- 204WING B59.15UNBOOKED
B- 304WING B59.15UNBOOKED
B- 404WING B59.15BOOKED
B- 504WING B59.15UNBOOKED
B- 604WING B59.15BOOKED
B- 704WING B59.15UNBOOKED
C- 101WING C59.15BOOKED
C- 201WING C59.15BOOKED
C- 301WING C59.15BOOKED
C- 401WING C59.15BOOKED
C- 501WING C59.15BOOKED
C- 601WING C59.15BOOKED
C- 701WING C59.15UNBOOKED
C- 102WING C59.15BOOKED
C- 202WING C59.15BOOKED
C- 302WING C59.15UNBOOKED
C- 402WING C59.15BOOKED
C- 502WING C59.15BOOKED
C- 602WING C59.15BOOKED
C- 702WING C59.15UNBOOKED
C- 103WING C59.15BOOKED
C- 203WING C59.15BOOKED
C- 303WING C59.15BOOKED
C- 403WING C59.15BOOKED
C- 503WING C59.15BOOKED
C- 603WING C59.15BOOKED
C- 703WING C59.15BOOKED
C- 104WING C59.15UNBOOKED
C- 204WING C59.15BOOKED
C- 304WING C59.15BOOKED
C- 404WING C59.15BOOKED
C- 504WING C59.15BOOKED
C- 604WING C59.15BOOKED
C- 704WING C59.15UNBOOKED
Unit 1UNIT 1 TO 9151.83BOOKED
Unit 2UNIT 1 TO 9146.69UNBOOKED
Unit 3UNIT 1 TO 9146.69BOOKED
Unit 4UNIT 1 TO 9146.69BOOKED
Unit 5UNIT 1 TO 9146.69BOOKED
Unit 6UNIT 1 TO 9146.69BOOKED
Unit 7UNIT 1 TO 9146.69BOOKED
Unit 8UNIT 1 TO 9146.69BOOKED
Unit 9UNIT 1 TO 9151.94BOOKED
Unit 10UNIT 10 TO 21134.74BOOKED
Unit 11UNIT 10 TO 21130.23BOOKED
Unit 12UNIT 10 TO 21130.23BOOKED
Unit 13UNIT 10 TO 21130.23BOOKED
Unit 14UNIT 10 TO 21130.23BOOKED
Unit 15UNIT 10 TO 21134.74BOOKED
Unit 16UNIT 10 TO 21134.74BOOKED
Unit 17UNIT 10 TO 21130.23BOOKED
Unit 18UNIT 10 TO 21130.23BOOKED
Unit 19UNIT 10 TO 21130.23BOOKED
Unit 20UNIT 10 TO 21130.23BOOKED
Unit 21UNIT 10 TO 21134.74BOOKED
Unit 22UNIT 22 TO 39134.74UNBOOKED
Unit 23UNIT 22 TO 39130.23BOOKED
Unit 24UNIT 22 TO 39130.23BOOKED
Unit 25UNIT 22 TO 39130.23BOOKED
Unit 26UNIT 22 TO 39130.23BOOKED
Unit 27UNIT 22 TO 39130.23BOOKED
Unit 28UNIT 22 TO 39130.23BOOKED
Unit 29UNIT 22 TO 39130.23BOOKED
Unit 30UNIT 22 TO 39130.23UNBOOKED
Unit 31UNIT 22 TO 39130.23BOOKED
Unit 32UNIT 22 TO 39130.23BOOKED
Unit 33UNIT 22 TO 39130.23BOOKED
Unit 34UNIT 22 TO 39130.23BOOKED
Unit 35UNIT 22 TO 39130.23BOOKED
Unit 36UNIT 22 TO 39130.23BOOKED
Unit 37UNIT 22 TO 39130.23UNBOOKED
Unit 38UNIT 22 TO 39130.23BOOKED
Unit 39UNIT 22 TO 39134.74BOOKED

Booking status as filed — confirm availability with the builder.

Construction progress

Reported completion: 100%
0%25%50%75%100%20192020202120222023September 2019 — 21.52% builtDecember 2019 — 29.56% builtMarch 2020 — 35.64% builtSeptember 2020 — 51.56% builtDecember 2020 — 57.6% builtMarch 2021 — 59.19% builtJune 2021 — 63.23% builtSeptember 2021 — 64.15% builtMarch 2022 — 70.23% builtJune 2022 — 77.27% builtMarch 2023 — 100% builtApril 2023 — 100% built

12 quarterly returns · September 2019 (21.52%) to April 2023 (100%)

21.52%

Initial progress · September 2019

100%

Final progress · April 2023

Builder-declared quarterly returns — not an independent inspection.

RERA activity timeline

  1. 2019

    Registration

  2. 2021

    Annual Compliance

  3. 2022

    Extension

  4. 2023

    Annual Compliance

  5. 2024

    Complaint

  6. 2025

    Complaint

  7. 2026

    Snapshot reviewed

Full application ledger (9 rows)
  1. Registration — 2019-04-30 11:34:21.000000
  2. Extension — 2022-11-10 18:14:02
  3. Complaint — 2024-04-09 16:49:18 · CMP0601202300680 (CLOSED)
  4. Complaint — 2025-12-24 17:50:44 · CMP0702202500072 (CLOSED)
  5. Complaint — 2025-12-24 17:51:22 · CMP0702202500073 (CLOSED)
  6. Annual Compliance — 2021-01-30 12:14:17
  7. Annual Compliance — 2021-12-30 17:21:57
  8. Annual Compliance — 2023-11-17 21:07:58
  9. Annual Compliance — 2023-11-17 21:07:58

Quarterly filing history

2019

Q-1 · Q-2

2020

Q-3 · Q-5 · Q-6

—

Q-4 · Q-10 · X-2 · X-1

2021

Q-7 · Q-8 · Q-9

2022

Q-11 · X-1

2023

X-2 · Q-E

12 submitted · 4 missing

Documents on file

42 documents

Missing from this record: Registration certificate.

Files open on the GujRERA portal — confirm the latest there. Entries without a link sit behind the portal viewer.

View documents on GujRERA

Search PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05346/EX1/101122 → Documents tab

Filing depth

Beyond the headline — land, money trail, inspection phases and the filing PDFs themselves.

Land & money

Village (moje)
Vavol
TP scheme
Vavol
Authority
Gandhinagar Urban Development Authority
Covered area
3285.14 sq m
Open area
4671.86 sq m
Land cost
₹3.63 Cr
Estimated cost
₹23.78 Cr
BU permission
Registration cert
Portal file
Ack no.
PR/GANDHINAGAR/GANDHINAGAR/GANDHINAGAR TPO/190409/007063
Covered parking
1 · 2074.98 sq m
Parking for sale
1

Escrow account

Bank
IDFC Bank
Branch
SECTOR 16
IFSC
IDFBOO42343
Account
XXXX-4970
Deposited
₹2.27 Cr
Withdrawn
₹2.1 Cr
Closing
₹0.17 Cr
Status
APPROVED

Inspection phases (Form-1)

Architect
NIRMAN ASSOCIATES
Site visit
2023-03-24
Form-1 PDF
Open file
  • Block WING A100%
  • Block WING B100%
  • Block WING C100%
  • Block UNIT 1 TO 9100%
  • Block UNIT 10 TO 21100%
  • Block UNIT 22 TO 39100%
Phase actual dates (6 blocks)
  • Block WING A: excavation — → slab —
  • Block WING B: excavation — → slab —
  • Block WING C: excavation — → slab —
  • Block UNIT 1 TO 9: excavation — → slab —
  • Block UNIT 10 TO 21: excavation — → slab —
  • Block UNIT 22 TO 39: excavation — → slab —

Filing PDFs

Project team on record

  • 912 CONSULTANTS · engineer
  • NIRMAN ASSOCIATES · architect
How is the paperwork score calculated?63 / 100
  • Delivery standing

    40 / 40

  • Filing discipline

    19 / 25

  • Promoter track record

    0 / 20

  • Complaints and extensions

    4 / 15

  • Delivery 2023-03-31 elapsed, builder-declared 100% (delivered) -> 40/40
  • QPR filings 12/16 -> 19/25
  • Promoter completed projects 0 -> 0/20
  • Red flags 3 complaints + 1 extension -> 4/15

Confidence Medium: QPR filing rate 75.0% is below 90%; no completed project on the promoter record; 3 complaint entries on the ledger; 1 extension request on the ledger.

Verify this yourself

If any figure here differs from the GujRERA record, the record is right and this page is wrong. GujRERA project pages have no stable public URL — search the filing number on the portal:

PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05346/EX1/101122

Open this project on GujRERARun the manual check →
Educational, not advisory — and never a project rating. The Gujarat explorer reads public GujRERA filings and computes a paperwork score from them, mechanically. It is not a LetsInvest verification, endorsement or approval of the project or its promoter, and it says nothing about build quality, resale value or whether you should buy. Confirm anything that matters on the official Gujarat RERA portal before you act.

Sources

Reviewed 26 Sept 2026. Portals move — the MoHUA national index is the fallback, and this hub links straight to each state portal.