Skip to content
Compare
Last updated: 2026-09-26Source: GujRERAOpen on GujRERA
Ongoing

Jeet Residency

Survey No. 381, Nr. Jeet Bunglows

ResidentialGroup Housing148 unitsRERA Reg. No. PR/GJ/GANDHINAGAR/6517

Filing PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA03412/A1R/031122

Jeet Residency — residential developmentGandhinagar · representative residential imagery

Paperwork score

Material gaps

A mechanical read of this promoter’s public filing record. Delivery standing carries the most weight and falls in steps the further the declared completion date has slipped; then quarterly filings, then the promoter’s own completed projects, then a check for complaints and extension requests on the ledger. It measures the filing record only — not construction quality, resale value, or whether you should buy — and it is not a LetsInvest rating of the project.

Bands: Complete record at 80%+ of the points available, Some gaps at 60–79%, Material gaps below 60%. The cut-offs come from how all 1,664 filings in this snapshot actually spread, not from a fixed grade — roughly a third reach “Complete record”, so it describes this filing rather than praising it.

Project statusOngoing
Quarterly filings22 / 31
Recorded complaints8
ExtensionsNone recorded
Promoter projectsNone completed on record

Project at a glance

Developer
Ghanshyam Bihola
Project type
Residential / Group Housing
Total units
148
Project cost
₹30.64 Cr
Carpet area
12,347.9 sq m
Price band
₹10L – ₹0L
Carpet area per unit
60.25-311.36 sq m
Status
Ongoing
Filing extras — blocks, inventory lines, dates
  • Residential/Group Housing — 148 units · carpet 12,347.94 sq m
  • Block Block-A
  • Block Block-B
  • Block Block-C
  • Block Sub Plot-6
  • Block Sub Plot-7
  • Block Sub Plot-8
  • Block Sub Plot-A1
  • Block Sub Plot-A2
  • Block Sub Plot-A3
  • Block Sub Plot-A4
  • Block Sub Plot-A5
  • Block Sub Plot-A6
  • Block Sub Plot-A7
  • Block Tenament-1
  • Block Tenament-10
  • Block Tenament-11
  • Block Tenament-12
  • Block Tenament-13
  • Block Tenament-14
  • Block Tenament-15
  • Block Tenament-16
  • Block Tenament-17
  • Block Tenament-18
  • Block Tenament-19
  • Block Tenament-2
  • Block Tenament-20
  • Block Tenament-21
  • Block Tenament-22
  • Block Tenament-23
  • Block Tenament-24
  • Block Tenament-25
  • Block Tenament-26
  • Block Tenament-27
  • Block Tenament-28
  • Block Tenament-29
  • Block Tenament-3
  • Block Tenament-30
  • Block Tenament-31
  • Block Tenament-32
  • Block Tenament-33
  • Block Tenament-34
  • Block Tenament-35
  • Block Tenament-36
  • Block Tenament-37
  • Block Tenament-38
  • Block Tenament-39
  • Block Tenament-4
  • Block Tenament-40
  • Block Tenament-41
  • Block Tenament-42
  • Block Tenament-43
  • Block Tenament-44
  • Block Tenament-45
  • Block Tenament-46
  • Block Tenament-47
  • Block Tenament-48
  • Block Tenament-49
  • Block Tenament-5
  • Block Tenament-50
  • Block Tenament-51
  • Block Tenament-52
  • Block Tenament-53
  • Block Tenament-54
  • Block Tenament-6
  • Block Tenament-7
  • Block Tenament-8
  • Block Tenament-9
  • Declared start 2018-05-04 · completion 2026-06-12
  • Professionals on record: 1 architect(s), 1 engineer(s) · land not itemised

Location

23.2186° N, 72.6984° E

Filed plot outline · 5 corners
Open in Google Maps

Units & inventory

148

Total units

140

Booked (95%)

8

Unsold (5%)

95% booked · 5% unsold

Tower Block-A28 units

28 booked (100%) · 0 available (0%)

Tower Block-B28 units

21 booked (75%) · 7 available (25%)

Tower Block-C28 units

28 booked (100%) · 0 available (0%)

Tower Sub Plot-61 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-71 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-81 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-A11 units

0 booked (0%) · 1 available (100%)

Tower Sub Plot-A21 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-A31 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-A41 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-A51 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-A61 units

1 booked (100%) · 0 available (0%)

Tower Sub Plot-A71 units

1 booked (100%) · 0 available (0%)

Tower Tenament-11 units

1 booked (100%) · 0 available (0%)

Tower Tenament-101 units

1 booked (100%) · 0 available (0%)

Tower Tenament-111 units

1 booked (100%) · 0 available (0%)

Tower Tenament-121 units

1 booked (100%) · 0 available (0%)

Tower Tenament-131 units

1 booked (100%) · 0 available (0%)

Tower Tenament-141 units

1 booked (100%) · 0 available (0%)

Tower Tenament-151 units

1 booked (100%) · 0 available (0%)

Tower Tenament-161 units

1 booked (100%) · 0 available (0%)

Tower Tenament-171 units

1 booked (100%) · 0 available (0%)

Tower Tenament-181 units

1 booked (100%) · 0 available (0%)

Tower Tenament-191 units

1 booked (100%) · 0 available (0%)

Tower Tenament-21 units

1 booked (100%) · 0 available (0%)

Tower Tenament-201 units

1 booked (100%) · 0 available (0%)

Tower Tenament-211 units

1 booked (100%) · 0 available (0%)

Tower Tenament-221 units

1 booked (100%) · 0 available (0%)

Tower Tenament-231 units

1 booked (100%) · 0 available (0%)

Tower Tenament-241 units

1 booked (100%) · 0 available (0%)

Tower Tenament-251 units

1 booked (100%) · 0 available (0%)

Tower Tenament-261 units

1 booked (100%) · 0 available (0%)

Tower Tenament-271 units

1 booked (100%) · 0 available (0%)

Tower Tenament-281 units

1 booked (100%) · 0 available (0%)

Tower Tenament-291 units

1 booked (100%) · 0 available (0%)

Tower Tenament-31 units

1 booked (100%) · 0 available (0%)

Tower Tenament-301 units

1 booked (100%) · 0 available (0%)

Tower Tenament-311 units

1 booked (100%) · 0 available (0%)

Tower Tenament-321 units

1 booked (100%) · 0 available (0%)

Tower Tenament-331 units

1 booked (100%) · 0 available (0%)

Tower Tenament-341 units

1 booked (100%) · 0 available (0%)

Tower Tenament-351 units

1 booked (100%) · 0 available (0%)

Tower Tenament-361 units

1 booked (100%) · 0 available (0%)

Tower Tenament-371 units

1 booked (100%) · 0 available (0%)

Tower Tenament-381 units

1 booked (100%) · 0 available (0%)

Tower Tenament-391 units

1 booked (100%) · 0 available (0%)

Tower Tenament-41 units

1 booked (100%) · 0 available (0%)

Tower Tenament-401 units

1 booked (100%) · 0 available (0%)

Tower Tenament-411 units

1 booked (100%) · 0 available (0%)

Tower Tenament-421 units

1 booked (100%) · 0 available (0%)

Tower Tenament-431 units

1 booked (100%) · 0 available (0%)

Tower Tenament-441 units

1 booked (100%) · 0 available (0%)

Tower Tenament-451 units

1 booked (100%) · 0 available (0%)

Tower Tenament-461 units

1 booked (100%) · 0 available (0%)

Tower Tenament-471 units

1 booked (100%) · 0 available (0%)

Tower Tenament-481 units

1 booked (100%) · 0 available (0%)

Tower Tenament-491 units

1 booked (100%) · 0 available (0%)

Tower Tenament-51 units

1 booked (100%) · 0 available (0%)

Tower Tenament-501 units

1 booked (100%) · 0 available (0%)

Tower Tenament-511 units

1 booked (100%) · 0 available (0%)

Tower Tenament-521 units

1 booked (100%) · 0 available (0%)

Tower Tenament-531 units

1 booked (100%) · 0 available (0%)

Tower Tenament-541 units

1 booked (100%) · 0 available (0%)

Tower Tenament-61 units

1 booked (100%) · 0 available (0%)

Tower Tenament-71 units

1 booked (100%) · 0 available (0%)

Tower Tenament-81 units

1 booked (100%) · 0 available (0%)

Tower Tenament-91 units

1 booked (100%) · 0 available (0%)

Flat-level inventory (148 units)
Flat inventory: block, carpet area and booking status
FlatBlockCarpet m²Status
Tenament-1Tenament-189.22BOOKED
Tenament-2Tenament-289.22BOOKED
Tenament-3Tenament-389.22BOOKED
Tenament-4Tenament-489.22BOOKED
Tenament-5Tenament-589.22BOOKED
Tenament-6Tenament-689.22BOOKED
Tenament-7Tenament-7113.69BOOKED
Tenament-8Tenament-8113.69BOOKED
Tenament-9Tenament-989.22BOOKED
Tenament-10Tenament-1089.22BOOKED
Tenament-11Tenament-11120.2BOOKED
Tenament-12Tenament-12120.2BOOKED
Tenament-13Tenament-1392.42BOOKED
Tenament-14Tenament-1492.42BOOKED
Tenament-15Tenament-1592.42BOOKED
Tenament-16Tenament-1692.42BOOKED
Tenament-17Tenament-17120.2BOOKED
Tenament-18Tenament-18120.2BOOKED
Tenament-19Tenament-19126.11BOOKED
Tenament-20Tenament-2092.42BOOKED
Tenament-21Tenament-2192.42BOOKED
Tenament-22Tenament-2292.42BOOKED
Tenament-23Tenament-23120.2BOOKED
Tenament-24Tenament-2492.42BOOKED
Tenament-25Tenament-25120.2BOOKED
Tenament-26Tenament-26120.2BOOKED
Tenament-27Tenament-2792.42BOOKED
Tenament-28Tenament-2892.42BOOKED
Tenament-29Tenament-2992.42BOOKED
Tenament-30Tenament-30120.2BOOKED
Tenament-31Tenament-31120.2BOOKED
Tenament-32Tenament-3292.42BOOKED
Tenament-33Tenament-3392.42BOOKED
Tenament-34Tenament-34120.2BOOKED
Tenament-35Tenament-35120.2BOOKED
Tenament-36Tenament-3692.42BOOKED
Tenament-37Tenament-37120.2BOOKED
Tenament-38Tenament-38120.2BOOKED
Tenament-39Tenament-39120.2BOOKED
Tenament-40Tenament-40120.2BOOKED
Tenament-41Tenament-4192.42BOOKED
Tenament-42Tenament-42120.2BOOKED
Tenament-43Tenament-43120.2BOOKED
Tenament-44Tenament-4492.42BOOKED
Tenament-45Tenament-4592.42BOOKED
Tenament-46Tenament-4692.42BOOKED
Tenament-47Tenament-47120.2BOOKED
Tenament-48Tenament-48120.2BOOKED
Tenament-49Tenament-49120.2BOOKED
Tenament-50Tenament-50120.2BOOKED
Tenament-51Tenament-51120.2BOOKED
Tenament-52Tenament-52120.2BOOKED
Tenament-53Tenament-53120.2BOOKED
Tenament-54Tenament-54120.2BOOKED
Sub Plot-A1Sub Plot-A1124.22UNBOOKED
Sub Plot-A2Sub Plot-A2124.25BOOKED
Sub Plot-A3Sub Plot-A3124.13BOOKED
Sub Plot-A4Sub Plot-A4124.25BOOKED
Sub Plot-A5Sub Plot-A5124.81BOOKED
Sub Plot-A6Sub Plot-A695.6BOOKED
Sub Plot-A7Sub Plot-A7109.18BOOKED
Sub Plot-6Sub Plot-6206.58BOOKED
Sub Plot-7Sub Plot-7206.75BOOKED
Sub Plot-8Sub Plot-8311.36BOOKED
A101Block-A60.25BOOKED
A102Block-A60.25BOOKED
A103Block-A60.25BOOKED
A104Block-A60.25BOOKED
A201Block-A60.25BOOKED
A202Block-A60.25BOOKED
A203Block-A60.25BOOKED
A204Block-A60.25BOOKED
A301Block-A60.25BOOKED
A302Block-A60.25BOOKED
A303Block-A60.25BOOKED
A304Block-A60.25BOOKED
A401Block-A60.25BOOKED
A402Block-A60.25BOOKED
A403Block-A60.25BOOKED
A404Block-A60.25BOOKED
A501Block-A60.25BOOKED
A502Block-A60.25BOOKED
A503Block-A60.25BOOKED
A504Block-A60.25BOOKED
A601Block-A60.25BOOKED
A602Block-A60.25BOOKED
A603Block-A60.25BOOKED
A604Block-A60.25BOOKED
A701Block-A60.25BOOKED
A702Block-A60.25BOOKED
A703Block-A60.25BOOKED
A704Block-A60.25BOOKED
B101Block-B60.25BOOKED
B102Block-B60.25BOOKED
B103Block-B60.25BOOKED
B104Block-B60.25BOOKED
B201Block-B60.25BOOKED
B202Block-B60.25BOOKED
B203Block-B60.25UNBOOKED
B204Block-B60.25BOOKED
B301Block-B60.25BOOKED
B302Block-B60.25UNBOOKED
B303Block-B60.25BOOKED
B304Block-B60.25BOOKED
B401Block-B60.25UNBOOKED
B402Block-B60.25UNBOOKED
B403Block-B60.25BOOKED
B404Block-B60.25BOOKED
B501Block-B60.25BOOKED
B502Block-B60.25BOOKED
B503Block-B60.25BOOKED
B504Block-B60.25BOOKED
B601Block-B60.25BOOKED
B602Block-B60.25BOOKED
B603Block-B60.25BOOKED
B604Block-B60.25BOOKED
B701Block-B60.25BOOKED
B702Block-B60.25UNBOOKED
B703Block-B60.25UNBOOKED
B704Block-B60.25UNBOOKED
C101Block-C60.25BOOKED
C102Block-C60.25BOOKED
C103Block-C60.25BOOKED
C104Block-C60.25BOOKED
C201Block-C60.25BOOKED
C202Block-C60.25BOOKED
C203Block-C60.25BOOKED
C204Block-C60.25BOOKED
C301Block-C60.25BOOKED
C302Block-C60.25BOOKED
C303Block-C60.25BOOKED
C304Block-C60.25BOOKED
C401Block-C60.25BOOKED
C402Block-C60.25BOOKED
C403Block-C60.25BOOKED
C404Block-C60.25BOOKED
C501Block-C60.25BOOKED
C502Block-C60.25BOOKED
C503Block-C60.25BOOKED
C504Block-C60.25BOOKED
C601Block-C60.25BOOKED
C602Block-C60.25BOOKED
C603Block-C60.25BOOKED
C604Block-C60.25BOOKED
C701Block-C60.25BOOKED
C702Block-C60.25BOOKED
C703Block-C60.25BOOKED
C704Block-C60.25BOOKED

Booking status as filed — confirm availability with the builder.

Construction progress

Reported completion: 84.06%
0%25%50%75%100%2019202020212022202320242026February 2019 — 18.59% builtMay 2019 — 22.16% builtAugust 2019 — 25.03% builtNovember 2019 — 30.23% builtFebruary 2020 — 36.26% builtAugust 2020 — 60.23% builtMay 2020 — 60.23% builtNovember 2020 — 63.06% builtFebruary 2021 — 68.21% builtMay 2021 — 70.38% builtAugust 2021 — 71.44% builtNovember 2021 — 75.44% builtFebruary 2022 — 77.6% builtMay 2022 — 100% builtAugust 2022 — 100% builtNovember 2022 — 100% builtFebruary 2023 — 99.58% builtMay 2023 — 99.8% builtAugust 2023 — 99.8% builtNovember 2023 — 99.98% builtJanuary 2024 — 84.06% builtJuly 2026 — 84.06% built

22 quarterly returns · February 2019 (18.59%) to July 2026 (84.06%)

18.59%

Initial progress · February 2019

84.06%

Final progress · July 2026

Builder-declared quarterly returns — not an independent inspection.

RERA activity timeline

  1. 2018

    Registration

  2. 2019

    Complaint · Challan · Annual Compliance · BCR

  3. 2020

    Complaint

  4. 2021

    Complaint · Annual Compliance

  5. 2022

    Alteration · Complaint

  6. 2023

    Challan · Annual Compliance

  7. 2024

    Annual Compliance · LEGAL_PCWF

  8. Undated

    Complaint · Annual Compliance

  9. 2026

    Snapshot reviewed

Full application ledger (22 rows)
  1. Registration — 2018-09-14 14:46:46.000000
  2. Alteration — 2022-11-03 17:53:09.000000
  3. Complaint — 2019-05-03 17:09:15 · GJ/CMP/SM/Gandhinagar/190503/0154 (CLOSED)
  4. Complaint — 2020-03-21 16:41:14 · CMP/Gandhinagar/190814/000245 (CLOSED)
  5. Complaint — 2020-03-21 16:27:58 · CMP/Gandhinagar/190821/000257 (CLOSED)
  6. Complaint — 2020-03-21 16:29:09 · CMP/Gandhinagar/190817/000248 (CLOSED)
  7. Complaint — 2021-03-26 18:33:26 · CMP/Gandhinagar/190821/000258 (CLOSED)
  8. Complaint — 2020-03-21 16:31:19 · CMP/Gandhinagar/190818/000251 (CLOSED)
  9. Complaint — 2022-12-22 10:27:32 · GJ/CMP/SM/Gandhinagar/221214/0101 (CLOSED)
  10. Complaint — undated · CMP1211202501377 (HEARING_SCHEDULE)
  11. Challan — 2019-07-10 14:33:00 · GJ/CMP/SM/Gandhinagar/190503/0154 (status not published)
  12. Challan — 2023-01-11 16:47:04 · GJ/CMP/SM/Gandhinagar/221214/0101 (status not published)
  13. Annual Compliance — 2019-10-08 13:42:26
  14. Annual Compliance — 2021-01-30 15:34:09
  15. Annual Compliance — 2021-12-24 15:35:52
  16. Annual Compliance — 2023-11-17 21:08:12
  17. Annual Compliance — 2023-11-17 21:08:12
  18. Annual Compliance — 2024-10-04 17:14:42
  19. Annual Compliance — undated
  20. Annual Compliance — undated
  21. LEGAL_PCWF — 2024-04-01 16:25:47
  22. BCR — 2019-08-06 19:15:15.000000

Quarterly filing history

2019

Q-1 · Q-2 · Q-3 · Q-4

2020

Q-5 · Q-6 · Q-7 · Q-8 · Q-9

2021

Q-10 · Q-11 · Q-12

2022

Q-13 · Q-14 · Q-15 · Q-16

2023

Q-17 · Q-18 · Q-19 · Q-20

2024

Q-21 · Q-E

—

Q-22 · Q-23 · Q-24 · Q-25 · Q-26 · Q-27 · Q-28 · X-1 · X-2

22 submitted · 9 missing

Documents on file

36 documents

Missing from this record: Registration certificate, Title clearance certificate, Title report.

Files open on the GujRERA portal — confirm the latest there. Entries without a link sit behind the portal viewer.

View documents on GujRERA

Search PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA03412/A1R/031122 → Documents tab

Filing depth

Beyond the headline — land, money trail, inspection phases and the filing PDFs themselves.

Land & money

Authority
Others
Covered area
5691.42 sq m
Open area
8695.58 sq m
Land cost
₹6.48 Cr
Estimated cost
₹25.88 Cr
Registration cert
Portal file
Ack no.
PR/GANDHINAGAR/GANDHINAGAR/GANDHINAGAR TPO/180619/005611
Parking for sale
31

Escrow account

Bank
Baroda Gujarat Gramin Bank
Branch
PALAJ, GANDHINAGAR
IFSC
BKDN0700000
Account
XXXX-0033
Deposited
₹0.62 Cr
Withdrawn
₹0.62 Cr
Closing
₹0 Cr
Status
APPROVED

Inspection phases (Form-1)

Architect
NIMESH SHANTILAL PATEL
Firm
ZERO LIGHT STUDIO
Site visit
2024-02-23
Form-1 PDF
Open file
  • Block Tenament-181.25%
  • Block Tenament-281.25%
  • Block Tenament-381.25%
  • Block Tenament-481.25%
  • Block Tenament-581.25%
  • Block Tenament-681.25%
  • Block Tenament-781.25%
  • Block Tenament-881.25%
  • Block Tenament-981.25%
  • Block Tenament-1081.25%
  • Block Tenament-1181.25%
  • Block Tenament-1281.25%
  • Block Tenament-1381.25%
  • Block Tenament-1481.25%
  • Block Tenament-1581.25%
  • Block Tenament-1681.25%
  • Block Tenament-1781.25%
  • Block Tenament-1881.25%
  • Block Tenament-1981.25%
  • Block Tenament-2081.25%
  • Block Tenament-2181.25%
  • Block Tenament-2281.25%
  • Block Tenament-2381.25%
  • Block Tenament-2481.25%
  • Block Tenament-2581.25%
  • Block Tenament-2681.25%
  • Block Tenament-2781.25%
  • Block Tenament-2881.25%
  • Block Tenament-2981.25%
  • Block Tenament-3081.25%
  • Block Tenament-3181.25%
  • Block Tenament-3281.25%
  • Block Tenament-3381.25%
  • Block Tenament-3481.25%
  • Block Tenament-3581.25%
  • Block Tenament-3681.25%
  • Block Tenament-3781.25%
  • Block Tenament-3881.25%
  • Block Tenament-3981.25%
  • Block Tenament-4081.25%
  • Block Tenament-4181.25%
  • Block Tenament-4281.25%
  • Block Tenament-4381.25%
  • Block Tenament-4481.25%
  • Block Tenament-4581.25%
  • Block Tenament-4681.25%
  • Block Tenament-4781.25%
  • Block Tenament-4881.25%
  • Block Tenament-4981.25%
  • Block Tenament-5081.25%
  • Block Tenament-5181.25%
  • Block Tenament-5281.25%
  • Block Tenament-5381.25%
  • Block Tenament-5481.25%
  • Block Sub Plot-A181.25%
  • Block Sub Plot-A281.25%
  • Block Sub Plot-A381.25%
  • Block Sub Plot-A481.25%
  • Block Sub Plot-A581.25%
  • Block Sub Plot-A681.25%
  • Block Sub Plot-A781.25%
  • Block Sub Plot-681.25%
  • Block Sub Plot-781.25%
  • Block Sub Plot-881.25%
  • Block Block-A81.25%
  • Block Block-B81.25%
  • Block Block-C81.25%
Phase actual dates (67 blocks)
  • Block Tenament-2: excavation → slab
  • Block Tenament-1: excavation → slab
  • Block Tenament-4: excavation → slab
  • Block Tenament-3: excavation → slab
  • Block Tenament-6: excavation → slab
  • Block Tenament-5: excavation → slab
  • Block Tenament-8: excavation → slab
  • Block Tenament-7: excavation → slab
  • Block Tenament-10: excavation → slab
  • Block Tenament-9: excavation → slab
  • Block Tenament-12: excavation → slab
  • Block Tenament-11: excavation → slab
  • Block Tenament-14: excavation → slab
  • Block Tenament-13: excavation → slab
  • Block Tenament-16: excavation → slab
  • Block Tenament-15: excavation → slab
  • Block Tenament-18: excavation → slab
  • Block Tenament-17: excavation → slab
  • Block Tenament-20: excavation → slab
  • Block Tenament-19: excavation → slab
  • Block Tenament-22: excavation → slab
  • Block Tenament-21: excavation → slab
  • Block Tenament-24: excavation → slab
  • Block Tenament-23: excavation → slab
  • Block Tenament-26: excavation → slab
  • Block Tenament-25: excavation → slab
  • Block Tenament-28: excavation → slab
  • Block Tenament-27: excavation → slab
  • Block Tenament-30: excavation → slab
  • Block Tenament-29: excavation → slab
  • Block Tenament-32: excavation → slab
  • Block Tenament-31: excavation → slab
  • Block Tenament-34: excavation → slab
  • Block Tenament-33: excavation → slab
  • Block Tenament-36: excavation → slab
  • Block Tenament-35: excavation → slab
  • Block Tenament-38: excavation → slab
  • Block Tenament-37: excavation → slab
  • Block Tenament-40: excavation → slab
  • Block Tenament-39: excavation → slab
  • Block Tenament-42: excavation → slab
  • Block Tenament-41: excavation → slab
  • Block Tenament-44: excavation → slab
  • Block Tenament-43: excavation → slab
  • Block Tenament-46: excavation → slab
  • Block Tenament-45: excavation → slab
  • Block Tenament-48: excavation → slab
  • Block Tenament-47: excavation → slab
  • Block Tenament-50: excavation → slab
  • Block Tenament-49: excavation → slab
  • Block Tenament-52: excavation → slab
  • Block Tenament-51: excavation → slab
  • Block Tenament-54: excavation → slab
  • Block Tenament-53: excavation → slab
  • Block Sub Plot-A2: excavation → slab
  • Block Sub Plot-A1: excavation → slab
  • Block Sub Plot-A4: excavation → slab
  • Block Sub Plot-A3: excavation → slab
  • Block Sub Plot-A6: excavation → slab
  • Block Sub Plot-A5: excavation → slab
  • Block Sub Plot-6: excavation → slab
  • Block Sub Plot-A7: excavation → slab
  • Block Sub Plot-8: excavation → slab
  • Block Sub Plot-7: excavation → slab
  • Block Block-B: excavation → slab
  • Block Block-A: excavation → slab
  • Block Block-C: excavation → slab

Filing PDFs

Project team on record

  • Narendrabhai Patel · engineer
  • Hemant Mehta · architect
How is the paperwork score calculated?50 / 100
  • Delivery standing

    24 / 40

  • Filing discipline

    18 / 25

  • Promoter track record

    0 / 20

  • Complaints and extensions

    8 / 15

  • Delivery 2026-06-12 elapsed 0 yr ago, progress 84.06% -> 24/40
  • QPR filings 22/31 -> 18/25
  • Promoter completed projects 0 -> 0/20
  • Red flags 8 complaints (live) + 0 extensions -> 8/15

Confidence Medium: declared completion date elapsed this year with work still declared incomplete; QPR filing rate 71.0% is below 90%; no completed project on the promoter record; 8 complaint entries on the ledger.

Verify this yourself

If any figure here differs from the GujRERA record, the record is right and this page is wrong. GujRERA project pages have no stable public URL — search the filing number on the portal:

PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA03412/A1R/031122

Open this project on GujRERARun the manual check →
Educational, not advisory — and never a project rating. The Gujarat explorer reads public GujRERA filings and computes a paperwork score from them, mechanically. It is not a LetsInvest verification, endorsement or approval of the project or its promoter, and it says nothing about build quality, resale value or whether you should buy. Confirm anything that matters on the official Gujarat RERA portal before you act.

Sources

Reviewed 26 Sept 2026. Portals move — the MoHUA national index is the fallback, and this hub links straight to each state portal.