Sharan Circle Hub
NR. 200 FT RING ROAD,
Filing PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/CAA00996/EX1/A1C/210323
Paperwork score
Complete record
A mechanical read of this promoter’s public filing record. Delivery standing carries the most weight and falls in steps the further the declared completion date has slipped; then quarterly filings, then the promoter’s own completed projects, then a check for complaints and extension requests on the ledger. It measures the filing record only — not construction quality, resale value, or whether you should buy — and it is not a LetsInvest rating of the project.
Bands: Complete record at 80%+ of the points available, Some gaps at 60–79%, Material gaps below 60%. The cut-offs come from how all 1,664 filings in this snapshot actually spread, not from a fixed grade — roughly a third reach “Complete record”, so it describes this filing rather than praising it.
Project at a glance
- Developer
- Rushabhdev Infraprojects Private Limited
- Project type
- Commercial
- Total units
- 272
- Project cost
- ₹51.4 Cr
- Carpet area
- 14,924.7 sq m
- Price band
- ₹7L – ₹0L
- Carpet area per unit
- 24.12-207.79 sq m
- Status
- Delivered
Filing extras — blocks, inventory lines, dates
- Commercial — 272 units · carpet 14,924.65 sq m
- Block A
- Declared start 2016-03-04 · completion 2023-07-31
- Professionals on record: 1 architect(s), 1 engineer(s) · land not itemised
Location
23.1299° N, 72.5841° E
Units & inventory
272
Total units
122
Booked (45%)
150
Unsold (55%)
45% booked · 55% unsold
122 booked (45%) · 150 available (55%)
Flat-level inventory (272 units)
| Flat | Block | Carpet m² | Status |
|---|---|---|---|
| 1 | A | 90.83 | BOOKED |
| 2 | A | 100.87 | BOOKED |
| 3 | A | 105.88 | BOOKED |
| 4 | A | 207.79 | BOOKED |
| 5 | A | 89.84 | BOOKED |
| 6 | A | 63.32 | BOOKED |
| 7 | A | 63.32 | BOOKED |
| 8 | A | 63.32 | BOOKED |
| 9 | A | 63.32 | BOOKED |
| 10 | A | 63.32 | BOOKED |
| 11 | A | 70.69 | BOOKED |
| 12 | A | 135.95 | BOOKED |
| 13 | A | 135.59 | BOOKED |
| 14 | A | 140.57 | BOOKED |
| 101 | A | 90.37 | BOOKED |
| 102 | A | 89.7 | BOOKED |
| 103 | A | 94.12 | BOOKED |
| 104 | A | 205.07 | BOOKED |
| 105 | A | 88.95 | BOOKED |
| 106 | A | 62.68 | BOOKED |
| 107 | A | 62.68 | BOOKED |
| 108 | A | 51.27 | UNBOOKED |
| 109 | A | 51.27 | UNBOOKED |
| 110 | A | 51.27 | UNBOOKED |
| 111 | A | 56.39 | UNBOOKED |
| 112 | A | 118.87 | UNBOOKED |
| 113 | A | 119.22 | UNBOOKED |
| 114 | A | 139.48 | UNBOOKED |
| 201 | A | 90.37 | BOOKED |
| 202 | A | 89.7 | UNBOOKED |
| 203 | A | 94.12 | UNBOOKED |
| 204 | A | 205.07 | UNBOOKED |
| 205 | A | 88.95 | UNBOOKED |
| 206 | A | 51.27 | UNBOOKED |
| 207 | A | 51.27 | UNBOOKED |
| 208 | A | 51.27 | UNBOOKED |
| 209 | A | 51.27 | UNBOOKED |
| 210 | A | 51.27 | UNBOOKED |
| 211 | A | 56.39 | UNBOOKED |
| 212 | A | 118.87 | UNBOOKED |
| 213 | A | 119.22 | UNBOOKED |
| 214 | A | 139.48 | UNBOOKED |
| 301 | A | 42.94 | BOOKED |
| 302 | A | 52.74 | BOOKED |
| 303 | A | 45.77 | BOOKED |
| 304 | A | 41.25 | UNBOOKED |
| 305 | A | 45.03 | BOOKED |
| 306 | A | 145.06 | BOOKED |
| 307 | A | 45.04 | BOOKED |
| 308 | A | 45.04 | BOOKED |
| 309 | A | 45.04 | BOOKED |
| 310 | A | 45.04 | BOOKED |
| 311 | A | 45.04 | BOOKED |
| 312 | A | 45.04 | BOOKED |
| 313 | A | 45.04 | BOOKED |
| 314 | A | 45.04 | BOOKED |
| 315 | A | 62.94 | BOOKED |
| 316 | A | 76.68 | BOOKED |
| 317 | A | 69.65 | BOOKED |
| 318 | A | 51.94 | BOOKED |
| 319 | A | 44.93 | BOOKED |
| 320 | A | 43.54 | BOOKED |
| 321 | A | 34.19 | UNBOOKED |
| 322 | A | 34.19 | BOOKED |
| 323 | A | 34.19 | BOOKED |
| 401 | A | 42.94 | UNBOOKED |
| 402 | A | 52.74 | BOOKED |
| 403 | A | 45.77 | UNBOOKED |
| 404 | A | 41.25 | UNBOOKED |
| 405 | A | 45.03 | UNBOOKED |
| 406 | A | 145.06 | BOOKED |
| 407 | A | 45.04 | BOOKED |
| 408 | A | 45.04 | BOOKED |
| 409 | A | 45.04 | BOOKED |
| 410 | A | 45.04 | UNBOOKED |
| 411 | A | 34.56 | BOOKED |
| 412 | A | 45.04 | UNBOOKED |
| 413 | A | 45.04 | UNBOOKED |
| 414 | A | 45.04 | UNBOOKED |
| 415 | A | 62.94 | BOOKED |
| 416 | A | 76.68 | UNBOOKED |
| 417 | A | 69.65 | UNBOOKED |
| 418 | A | 51.94 | BOOKED |
| 419 | A | 44.93 | UNBOOKED |
| 420 | A | 43.54 | BOOKED |
| 421 | A | 34.19 | UNBOOKED |
| 422 | A | 34.19 | UNBOOKED |
| 423 | A | 34.19 | BOOKED |
| 501 | A | 42.94 | UNBOOKED |
| 502 | A | 52.74 | BOOKED |
| 503 | A | 45.77 | UNBOOKED |
| 504 | A | 41.25 | UNBOOKED |
| 505 | A | 45.03 | UNBOOKED |
| 506 | A | 145.06 | BOOKED |
| 507 | A | 45.04 | BOOKED |
| 508 | A | 45.04 | UNBOOKED |
| 509 | A | 45.04 | BOOKED |
| 510 | A | 34.56 | UNBOOKED |
| 511 | A | 34.56 | BOOKED |
| 512 | A | 34.56 | BOOKED |
| 513 | A | 45.04 | BOOKED |
| 514 | A | 45.04 | BOOKED |
| 515 | A | 62.94 | BOOKED |
| 516 | A | 76.68 | BOOKED |
| 517 | A | 69.65 | BOOKED |
| 518 | A | 51.94 | BOOKED |
| 519 | A | 44.93 | UNBOOKED |
| 520 | A | 43.54 | BOOKED |
| 521 | A | 34.19 | BOOKED |
| 522 | A | 34.19 | BOOKED |
| 523 | A | 34.19 | UNBOOKED |
| 601 | A | 42.94 | BOOKED |
| 602 | A | 52.74 | BOOKED |
| 603 | A | 45.77 | BOOKED |
| 604 | A | 41.25 | BOOKED |
| 605 | A | 45.03 | UNBOOKED |
| 606 | A | 145.06 | UNBOOKED |
| 607 | A | 45.04 | BOOKED |
| 608 | A | 45.04 | BOOKED |
| 609 | A | 45.04 | UNBOOKED |
| 610 | A | 34.56 | BOOKED |
| 611 | A | 34.56 | UNBOOKED |
| 612 | A | 34.56 | BOOKED |
| 613 | A | 45.04 | UNBOOKED |
| 614 | A | 45.04 | BOOKED |
| 615 | A | 62.94 | BOOKED |
| 616 | A | 76.68 | UNBOOKED |
| 617 | A | 69.65 | UNBOOKED |
| 618 | A | 51.94 | UNBOOKED |
| 619 | A | 44.93 | UNBOOKED |
| 620 | A | 43.54 | UNBOOKED |
| 621 | A | 34.19 | BOOKED |
| 622 | A | 34.19 | BOOKED |
| 623 | A | 34.19 | BOOKED |
| 701 | A | 42.94 | UNBOOKED |
| 702 | A | 52.74 | UNBOOKED |
| 703 | A | 33.39 | BOOKED |
| 704 | A | 41.25 | BOOKED |
| 705 | A | 45.03 | BOOKED |
| 706 | A | 145.06 | BOOKED |
| 707 | A | 45.04 | BOOKED |
| 708 | A | 45.04 | BOOKED |
| 709 | A | 34.56 | BOOKED |
| 710 | A | 34.56 | UNBOOKED |
| 711 | A | 24.16 | UNBOOKED |
| 712 | A | 34.56 | BOOKED |
| 713 | A | 34.56 | BOOKED |
| 714 | A | 45.04 | BOOKED |
| 715 | A | 62.94 | BOOKED |
| 716 | A | 76.68 | UNBOOKED |
| 717 | A | 69.65 | UNBOOKED |
| 718 | A | 51.94 | UNBOOKED |
| 719 | A | 44.93 | UNBOOKED |
| 720 | A | 43.54 | UNBOOKED |
| 721 | A | 34.19 | UNBOOKED |
| 722 | A | 34.19 | UNBOOKED |
| 723 | A | 34.19 | BOOKED |
| 801 | A | 42.94 | BOOKED |
| 802 | A | 52.74 | UNBOOKED |
| 803 | A | 33.39 | UNBOOKED |
| 804 | A | 41.25 | UNBOOKED |
| 805 | A | 45.03 | UNBOOKED |
| 806 | A | 145.06 | BOOKED |
| 807 | A | 45.04 | BOOKED |
| 808 | A | 45.04 | BOOKED |
| 809 | A | 34.56 | BOOKED |
| 810 | A | 34.56 | BOOKED |
| 811 | A | 34.56 | BOOKED |
| 812 | A | 34.56 | BOOKED |
| 813 | A | 34.56 | BOOKED |
| 814 | A | 45.04 | BOOKED |
| 815 | A | 62.94 | BOOKED |
| 816 | A | 76.68 | BOOKED |
| 817 | A | 69.65 | BOOKED |
| 818 | A | 51.94 | BOOKED |
| 819 | A | 44.93 | BOOKED |
| 820 | A | 43.54 | BOOKED |
| 821 | A | 34.19 | UNBOOKED |
| 822 | A | 34.19 | BOOKED |
| 823 | A | 34.19 | BOOKED |
| 901 | A | 42.94 | UNBOOKED |
| 902 | A | 52.74 | UNBOOKED |
| 903 | A | 33.39 | UNBOOKED |
| 904 | A | 31.47 | UNBOOKED |
| 905 | A | 45.03 | UNBOOKED |
| 906 | A | 145.06 | UNBOOKED |
| 907 | A | 45.04 | UNBOOKED |
| 908 | A | 34.56 | UNBOOKED |
| 909 | A | 34.56 | UNBOOKED |
| 910 | A | 24.12 | UNBOOKED |
| 911 | A | 24.12 | UNBOOKED |
| 912 | A | 24.12 | UNBOOKED |
| 913 | A | 34.56 | UNBOOKED |
| 914 | A | 34.56 | UNBOOKED |
| 915 | A | 62.94 | UNBOOKED |
| 916 | A | 76.68 | UNBOOKED |
| 917 | A | 69.65 | UNBOOKED |
| 918 | A | 51.94 | UNBOOKED |
| 919 | A | 44.93 | UNBOOKED |
| 920 | A | 43.54 | UNBOOKED |
| 921 | A | 34.19 | UNBOOKED |
| 922 | A | 34.19 | UNBOOKED |
| 923 | A | 34.19 | UNBOOKED |
| 1001 | A | 42.94 | UNBOOKED |
| 1002 | A | 52.74 | UNBOOKED |
| 1003 | A | 33.39 | UNBOOKED |
| 1004 | A | 31.47 | UNBOOKED |
| 1005 | A | 45.03 | UNBOOKED |
| 1006 | A | 145.06 | BOOKED |
| 1007 | A | 45.04 | BOOKED |
| 1008 | A | 34.56 | BOOKED |
| 1009 | A | 34.56 | UNBOOKED |
| 1010 | A | 24.12 | UNBOOKED |
| 1011 | A | 24.12 | UNBOOKED |
| 1012 | A | 24.12 | UNBOOKED |
| 1013 | A | 24.12 | UNBOOKED |
| 1014 | A | 34.56 | UNBOOKED |
| 1015 | A | 62.94 | UNBOOKED |
| 1016 | A | 76.68 | UNBOOKED |
| 1017 | A | 69.65 | UNBOOKED |
| 1018 | A | 51.94 | UNBOOKED |
| 1019 | A | 44.93 | UNBOOKED |
| 1020 | A | 43.54 | UNBOOKED |
| 1021 | A | 34.19 | UNBOOKED |
| 1022 | A | 34.19 | UNBOOKED |
| 1023 | A | 34.19 | UNBOOKED |
| 1101 | A | 42.94 | BOOKED |
| 1102 | A | 52.74 | BOOKED |
| 1103 | A | 33.39 | BOOKED |
| 1104 | A | 31.47 | BOOKED |
| 1105 | A | 35.21 | BOOKED |
| 1106 | A | 145.06 | UNBOOKED |
| 1107 | A | 34.56 | UNBOOKED |
| 1108 | A | 34.56 | UNBOOKED |
| 1109 | A | 24.12 | UNBOOKED |
| 1110 | A | 24.12 | UNBOOKED |
| 1111 | A | 24.12 | UNBOOKED |
| 1112 | A | 24.12 | UNBOOKED |
| 1113 | A | 24.12 | UNBOOKED |
| 1114 | A | 34.56 | UNBOOKED |
| 1115 | A | 48.41 | UNBOOKED |
| 1116 | A | 76.68 | UNBOOKED |
| 1117 | A | 69.65 | UNBOOKED |
| 1118 | A | 51.94 | UNBOOKED |
| 1119 | A | 44.93 | UNBOOKED |
| 1120 | A | 43.54 | UNBOOKED |
| 1121 | A | 34.19 | BOOKED |
| 1122 | A | 34.19 | BOOKED |
| 1123 | A | 34.19 | BOOKED |
| 1201 | A | 42.94 | UNBOOKED |
| 1202 | A | 52.74 | UNBOOKED |
| 1203 | A | 33.39 | UNBOOKED |
| 1204 | A | 31.47 | UNBOOKED |
| 1205 | A | 35.21 | UNBOOKED |
| 1206 | A | 145.06 | UNBOOKED |
| 1207 | A | 34.56 | UNBOOKED |
| 1208 | A | 24.12 | UNBOOKED |
| 1209 | A | 24.12 | UNBOOKED |
| 1210 | A | 24.12 | UNBOOKED |
| 1211 | A | 24.12 | UNBOOKED |
| 1212 | A | 24.12 | UNBOOKED |
| 1213 | A | 24.12 | UNBOOKED |
| 1214 | A | 24.12 | UNBOOKED |
| 1215 | A | 48.41 | UNBOOKED |
| 1216 | A | 76.68 | UNBOOKED |
| 1217 | A | 69.65 | UNBOOKED |
| 1218 | A | 51.94 | UNBOOKED |
| 1219 | A | 44.93 | UNBOOKED |
| 1220 | A | 43.54 | UNBOOKED |
| 1221 | A | 34.19 | UNBOOKED |
| 1222 | A | 34.19 | UNBOOKED |
| 1223 | A | 34.19 | UNBOOKED |
Booking status as filed — confirm availability with the builder.
Construction progress
Reported completion: 100%22 quarterly returns · May 2018 (13.39%) to August 2023 (100%)
13.39%
Initial progress · May 2018
100%
Final progress · August 2023
Builder-declared quarterly returns — not an independent inspection.
RERA activity timeline
2017
Registration
2019
Annual Compliance · BCR
2021
Annual Compliance
2022
Annual Compliance
2023
Alteration · Extension · Annual Compliance
Undated
Annual Compliance
2026
Snapshot reviewed
Full application ledger (10 rows)
- Registration — 2017-12-12 17:26:01.000000
- Alteration — 2023-03-21 12:02:49.000000
- Extension — 2023-02-01 13:58:41
- Annual Compliance — undated
- Annual Compliance — 2019-10-28 17:34:57
- Annual Compliance — 2021-01-30 18:09:08
- Annual Compliance — 2022-03-05 16:27:17
- Annual Compliance — 2023-11-17 21:05:31
- Annual Compliance — 2023-11-17 21:05:31
- BCR — 2019-12-24 20:26:01.000000
Quarterly filing history
2018
Q-1 · Q-2 · Q-3
2019
Q-4 · Q-5 · Q-6 · Q-7
2020
Q-8 · Q-10 · Q-11 · Q-12
—
Q-9
2021
Q-13 · Q-14 · Q-15 · Q-16
2022
Q-17 · Q-18 · X-1 · X-2
2023
X-1 · X-2 · Q-E
22 submitted · 1 missing
Documents on file
39 documentsMissing from this record: Registration certificate, Title clearance certificate, Title report.
Registration (0)Registration certificate
- None on this record.
Land & title (2)Title · EC · Clearance
2 of 2 open directly
Approvals (6)Plans · CC · NOCs
- Commencement certificate
- Sanctioned plan
- Approved layout plan
- Approved building plan
- Area development plan
- NOCs from authorities
6 of 6 open directly
Builder finances (22)Accounts · ITR · Audit reports
- Auditor's report (1 of 3)
- Auditor's report (2 of 3)
- Auditor's report (3 of 3)
- Director's report (1 of 3)
- Director's report (2 of 3)
- Director's report (3 of 3)
- Income-tax return (1 of 3)
- Income-tax return (2 of 3)
- Income-tax return (3 of 3)
- PAN card
- auditedBalSheetDoc1
- auditedBalSheetDoc2_
- auditedBalSheetDoc3
- auditedProfitLossSheetDoc1
- auditedProfitLossSheetDoc2
- auditedProfitLossSheetDoc3
- auditedReportDoc1
- auditedReportDoc2
- auditedReportDoc3
- cashFlowStmtFileDoc1
- cashFlowStmtFileDoc2
- cashFlowStmtFileDoc3
22 of 22 open directly
Files open on the GujRERA portal — confirm the latest there. Entries without a link sit behind the portal viewer.
View documents on GujRERASearch PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/CAA00996/EX1/A1C/210323 → Documents tab
Filing depth
Beyond the headline — land, money trail, inspection phases and the filing PDFs themselves.
Land & money
- Authority
- AUDA/AMC
- Covered area
- 1687 sq m
- Open area
- 2441 sq m
- Land cost
- ₹4.04 Cr
- Estimated cost
- ₹60.31 Cr
- BU permission
- Completion certificate
- Registration cert
- Portal file
- Ack no.
- PR/GANDHINAGAR/GANDHINAGAR/AUDA/170729/000558
- Covered parking
- 272 · 3211.22 sq m
- Parking for sale
- 50
Escrow account
- Bank
- STATE BANK OF INDIA
- Branch
- OVERSEAS BRANCH
- IFSC
- SBIN0004038
- Account
- XXXX-4846
- Deposited
- ₹0.42 Cr
- Withdrawn
- ₹0.42 Cr
- Closing
- ₹0 Cr
- Status
- APPROVED
Inspection phases (Form-1)
- Architect
- HARSHAD MISTRY
- Site visit
- 2023-06-30
- Form-1 PDF
- Open file
- Block A100%
Phase actual dates (1 block)
- Block A: excavation — → slab —
Filing PDFs
- REG_PROCESS · 2017-07-29 — · Form-2
- ALT_PROCESS · 2022-12-28 — Form-1 ·
- EXT_PROCESS · 2022-12-30 — Form-1 · Form-2
- Q-1 · 2018-04-06 — Form-1 · Form-2
- Q-2 · 2018-07-05 — Form-1 · Form-2
- Q-3 · 2018-10-06 — Form-1 · Form-2
- Q-4 · 2019-01-02 — Form-1 · Form-2
- Q-5 · 2019-04-03 — Form-1 · Form-2
- Q-6 · 2019-07-09 — Form-1 · Form-2
- Q-7 · 2019-10-07 — Form-1 · Form-2
- Q-8 · 2020-01-06 — Form-1 · Form-2
- Q-10 · 2020-08-29 — Form-1 · Form-2
- Q-11 · 2020-10-03 — Form-1 · Form-2
- Q-12 · 2020-12-19 — Form-1 · Form-2
- Q-13 · 2021-04-03 — Form-1 · Form-2
- Q-14 · 2021-07-06 — Form-1 · Form-2
- Q-15 · 2021-10-05 — Form-1 · Form-2
- Q-16 · 2021-12-31 — Form-1 · Form-2
- Q-17 · 2022-04-04 — Form-1 · Form-2
- Q-18 · 2022-07-06 — Form-1 · Form-2
- X-1 · 2022-10-07 — Form-1 · Form-2
- X-2 · 2022-12-22 — Form-1 · Form-2
- X-1 · 2023-04-01 — Form-1 · Form-2
- X-2 · 2023-07-04 — Form-1 · Form-2
- Q-E · 2023-07-27 — Form-1 · Form-2
- Form-5 · 2017-18 · SUBMITTED — Audit file
- Form-5 · 2018-19 · SUBMITTED — Audit file
- Form-5 · 2019-20 · SUBMITTED — Audit file
- Form-5 · 2020-21 · SUBMITTED — Audit file
- Form-5 · 2021-22 · SUBMITTED — Audit file
- Form-5 · 2022-23 · SUBMITTED — Audit file
Project team on record
- BHOOMI CONSULTANAT · engineer
- H.M. ARCHITECTS · architect
How is the paperwork score calculated?85 / 100
Delivery standing
40 / 40
Filing discipline
24 / 25
Promoter track record
10 / 20
Complaints and extensions
11 / 15
- Delivery 2023-07-31 elapsed, builder-declared 100% (delivered) -> 40/40
- QPR filings 22/23 -> 24/25
- Promoter completed projects 1 -> 10/20
- Red flags 0 complaints + 1 extension -> 11/15
Confidence Medium: 1 extension request on the ledger.
Verify this yourself
If any figure here differs from the GujRERA record, the record is right and this page is wrong. GujRERA project pages have no stable public URL — search the filing number on the portal:
PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/CAA00996/EX1/A1C/210323
Open this project on GujRERARun the manual check →Sources
Reviewed 26 Sept 2026. Portals move — the MoHUA national index is the fallback, and this hub links straight to each state portal.
- MoHUA - Real Estate Regulatory Authorities of States / UTsThe national index of every state/UT RERA portal. Fallback when a state link moves.
- GujRERA - Gujarat Real Estate Regulatory AuthorityGujarat project / agent / complaint search and registrations.